ODIN Optimized electric Drivetrain by Integration This project is co-funded of the EC.     7th Framework Programme
This project is co-funded by the
7th Framework Programme of the EC.


Work Packages



The overall project management is conducted by the Bosch Group.
The figure below shows the work packages part of ODIN and what the specific tasks within each package will be. For further information on the work packages please visit the respective subpages.
 

Work Package Index

WP1: Project management conducted by the Bosch Group
WP2: System Requirements and Concept Development
WP3: Component Development eDrive
WP4: Mecanical Component Development
WP5: System Integration and Performance Evaluation
WP6: Demonstrator Vehicle
WP7: Dissemination of Results (Deliverables and Publications)


 
© 2013 ODIN Optimized electric Drivetrain by Integration | Home | Imprint | Contact | Admin |